At present, the equipment of KRUE-330 kV of Belarusian NPP is connected to the power system via three 330 kV high-voltage lines: “Belarusian NPP - Postavy No. 1”, “Belarusian NPP - Minsk Severnaya”, “Belarusian NPP - Smorgon”.
As a result of the inclusion of new equipment and 330 kV overhead lines, the required reliability of the power supply of Belarusian NPP site was ensured for further commissioning. Belarusian NPP-Minsk Severnaya 330 kV overhead lines and Belarusian NPP-Smorgon 330 kV overhead lines put into operation increased the reliability of the power supply to Minsk and Grodno oblasts.